From: Albert (mailmd2011_at_gmail.com)
Date: Wed Feb 01 2012 - 23:34:31 CST

Hello:

   I've got two separate PDB trajectories : A contains 200 structures
and B contains 300 structures. I am wondering how to merge B after A in
VMD correctly so that I can analyze the merged PDB as single trajectory?

thank you very much.