As the network was out when we came in on the morning of the 12th of May, we decided that our best course of action was manual labor. And so we mounted a full 24 systems in the main rack, plus two more racks to hold the machines we were working on before.

(prev) 3508 Cabling

Back

3508 Cabling and Floor

We should at least have a closed floor in a few days...

Pictures by Tim Skirvin

Photo album generated by album from MarginalHacks by David