As the network was out when we came in on the morning of the 12th of May, we decided that our best course of action was manual labor. And so we mounted a full 24 systems in the main rack, plus two more racks to hold the machines we were working on before.

(prev) Bryan in 3508

Back

3508 Cabling

This is the leftover cabling from the rooms next door. It'll be a while.

Pictures by Tim Skirvin

Created with the tool photo album generator from David Madison's MarginalHacks