Having determined that the loading dock didn't have enough space, we spent the next few days trying to find some solutions to this problem. Step one: move things to storage and start working on a test cluster. Step two: start assembling in what space we might have, using the lessons of step one. And so by the end of 11 May 2004, we had a full five systems mounted in the rack.

(prev) System Two, Boxed

Back

Mini-Cluster

By the end of the 10th, we had this actually set up as a small cluster, so that Jim could work on it.

Pictures by Tim Skirvin

Photo album generated by album script a MarginalHack written by D. Madison