Having determined that the loading dock didn't have enough space, we spent the next few days trying to find some solutions to this problem. Step one: move things to storage and start working on a test cluster. Step two: start assembling in what space we might have, using the lessons of step one. And so by the end of 11 May 2004, we had a full five systems mounted in the rack.

(prev) System One, Assembled

Back

System Two, Boxed

This is what the nodes look like as they come out of the boxes.

Pictures by Tim Skirvin

Album created by album tool from MarginalHacks by David