The first round of cluster nodes arrived in Beckman on 06 May 2004. Our first indication of this was a fairly panicked phone call from receiving, worried that we had filled up their entire loading dock with 52 machines and two racks... Unfortunately, as our machine room was not yet set up, we didn't have anywhere to put them; all we could do was take some pictures...

(prev) Machine Room Floor

Back

Machine Room Ceiling

It's hard to see, but there's still holes in the ceiling.

Pictures by Tim Skirvin (most) and John Stone (anything with Tim in it)

Created with the tool album generator from David Madison's MarginalHacks