As of the afternoon of the 18th, the air conditioning was ready to go and the machines were ready to be started up. A month after we had gotten the systems, they are in place and ready to go.

(prev) Rotated

Back

Final Inspection

One final check to make sure everything's in place.

Pictures by Tim Skirvin

Created with the tool photo album generator a tool written by David Madison