As the network was out when we came in on the morning of the 12th of May, we decided that our best course of action was manual labor. And so we mounted a full 24 systems in the main rack, plus two more racks to hold the machines we were working on before.

(prev) Final Product, II

Back

Network Wiring

The time had come to ensure that the network cables we had purchased were the right length and the switch was located in the right place. (It all worked.)

Pictures by Tim Skirvin

Album created by album script a Marginal Hack written by David