As the network was out when we came in on the morning of the 12th of May, we decided that our best course of action was manual labor. And so we mounted a full 24 systems in the main rack, plus two more racks to hold the machines we were working on before.

(prev) Mounting Rails

Back

Preparing the Systems

We pulled 21 of these systems up today, and had to prepare them all for the rack.

Pictures by Tim Skirvin

Photo album generated by album generator a tool written by Dave