Having determined that the loading dock didn't have enough space, we spent the next few days trying to find some solutions to this problem. Step one: move things to storage and start working on a test cluster. Step two: start assembling in what space we might have, using the lessons of step one. And so by the end of 11 May 2004, we had a full five systems mounted in the rack.

(prev) Rack and Rails

Back

Destroyed Floor

It doesn't show up well, but we beat up the floor tiles with the rack as it went through. Oops.

Pictures by Tim Skirvin

Created with the tool album generator from Marginal Hacks by Dave