Having determined that the loading dock didn't have enough space, we spent the next few days trying to find some solutions to this problem. Step one: move things to storage and start working on a test cluster. Step two: start assembling in what space we might have, using the lessons of step one. And so by the end of 11 May 2004, we had a full five systems mounted in the rack.

(prev) ...down the ramp...

Back

...and out the door!

John pushes the rack out to the hallway, where we can start using it for storage for the first time.

Pictures by Tim Skirvin

Created with the tool album script a free tool written by David Ljung