RMSD calculation

From: Vibhor Agrawal (vibhora_at_g.clemson.edu)
Date: Fri Aug 02 2013 - 21:44:47 CDT

Dear Namd Users

I have a small doubt the way RMSD calculation are done in NAMD.
i have a trajectory of 783 frames and when I try to calculate the RMSD
,Calculations are based on the first frame as a reference. Is it possible
to calculate the RMSD based with the pdb structures as a reference.

Thanks

Vibhor

This archive was generated by hypermail 2.1.6 : Tue Dec 31 2013 - 23:23:32 CST